The homes uses 600,000 lbs of recycled materials and took over 3 years of designing before the final form was unveiled. Constructed from materials from steel to rubber tubing, the final cost of the dwellings is around $150 per square foot.


my image collections of interior design in the world
0 comments:
Post a Comment